Singapore Satellite Terminal

Client: SLNG

Year Complete: 2010

 

Project Details:

Basic Design of a High Saturation Temperature Satellite LNG Terminal

 

Whessoe’s Scope:

Feasibility Study, Basic Engineering, Design & Estimate

 

  • Feasibility Study for a 1½ MTPA LNG Satellite Terminal (Daily Off-loading)
  • Shipping logistics including ship and tank sizing, frequency and optimal unloading cases
  • Application of the J-Screen water intake system
  • High pressure In-tank pumps direct to Sea Water Heated Shell & Tube Vaporisers
  • Truck Loading System

 

singaporeTerm1

Translate »