Singapore Satellite Terminal
Client: SLNG
Year Complete: 2010
Project Details:
Basic Design of a High Saturation Temperature Satellite LNG Terminal
Whessoe’s Scope:
Feasibility Study, Basic Engineering, Design & Estimate
- Feasibility Study for a 1½ MTPA LNG Satellite Terminal (Daily Off-loading)
- Shipping logistics including ship and tank sizing, frequency and optimal unloading cases
- Application of the J-Screen water intake system
- High pressure In-tank pumps direct to Sea Water Heated Shell & Tube Vaporisers
- Truck Loading System