Ultra Tank Design
Client: Samsung C&T (for SLNG 3 Bid Options)
Year Complete: 2013
Project Details:
Basic Design of Ultra Sized Full Containment LNG Storage Tank
Whessoe’s Scope:
Engineering Design, Independent Design Verification
The Ultra Tank Project is a design project for both the outer concrete tank and the inner 9% Nickel tank for a 260,000m³ capacity Liquefied Natural Gas (LNG), full containment tank. The tank comprises a piled foundation with a reinforced concrete base slab, a post tensioned concrete wall and a domed outer concrete roof and roof ring beam.
The project objective was to obtain third party review and approval of the Ultra tank design to enable client pre-qualification.
This was achieved in a record time of a 4 months with DNV (Det Norske Veritas) providing the independent third party approval.